1. K. E. Stecke, “Formulation and solution of nonlinear integer production planning problem for flexible manufacturing system”,Management Science,29, 3–12, 1983.
2. S. Rajagopalan, “Formulation and heuristic solutions for parts grouping and tool loading in flexible manufacturing systems”, in K. E. Stecke and R. Suri (ed.)Proceedings of the second ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Application, Ann Arbor, Elsevier, Amsterdam, pp. 311–320, 1986.
3. S. S. Hwang, “A constraint directed method to solve the part selection problem in FMS planning stage”, in K. E. Stecke and R. Suri (ed.)Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems, Ann Arbor, Elsevier, Amsterdam, pp. 297–309, 1986.
4. P. J. O'Grady and U. Menon, “Loading flexible manufacturing system”,International Journal of Production Research,25, 1053–1068, 1987.
5. A. Kwasi, J. R. Meredith and A. Raturi, “A comparison of tool management strategies and part selection rules for a flexible manufacturing system”,International Journal of Production Research,30, 733–748, 1992.