1. AL-HOMOUD A.S., TAL, A. and HUSEIN (Malkwai) A.I., 1994a: “Instability and Stabilization of an Embankment on the Irbid-Amman Highway in Jordan”,Canadian Geotechnical Journal, vol 31, pp. 1015–1021.
2. AL-HOMOUD A.S., SAKET S. and HUSEIN (Malkawi) A.I., 1994b: “Investigation of Failure of Highway Embankment Founded on Colluvium and Suggested Stabilization Measures for Reconstruction”,Int. Journal of Engineering Geology, vol. 38, pp. 95–116.
3. AL-HOMOUD A.S., HUSEIN (Malkawi) A.I., BASMA A. and TAL A., 1995a: “Geotechnical Investigation of Embankment Foundation Instability and Landslide at Station 40+700 on Irbid Amman Highway, Jordan”, Africa Geoscience Review, Rock View Int., Vol. 2, No. 2, pp. 247–265.
4. AL-HOMOUD A.S., TAQIEDDIN S.A., SALAMEH E., TAL A.B., SAKET S. and SADOON M.I., 1995b: “A Critical Overview of the Geotechnical Studies at Na'ur Landslide No. 4 in Jordan: Causes and Measures”,Int. Journal of Engineering Geology, Vol. 40(1/2), pp. 103–136.
5. AL-HOMOUD A.S., TAQIEDDIN S. and SAKET S., 1975c: “Investigation on the Geological and Geotechnical Factors Leading to a Major Slope Failure at a Selected Site on a Jordanian Highway”,Natural Hazards Journal, Kluwer Academic Publishers, Vol 12, Dec. pp. 203–224.