1. Ahmed, R. and Robinson, S. (2014). Modelling and Simulation in Business and Industry: Insights into the Processes and Practices of Expert Modellers. Journal of the Operational Research Society, 65(5), pp. 660–672.
2. Cochran, J.K., G.T. Mackulak, and P.A. Savory (1995). Simulation Project Characteristics in Industrial Settings. Interfaces, 25(4), pp. 104–113.
3. den Hengst, M., de Vreede, G.J. and Maghnouji, R. (2007). Using Soft OR Principles for Collaborative Simulation: A Case Study in the Dutch Airline Industry. Journal of the Operational Research Society, 58(5), pp. 669–682.
4. Drake, G.R. and Smith, J.S. (1996). Simulation System for Real-Time Planning, Scheduling, and Control. Proceedings of the 1996 Winter Simulation Conference (Charnes, J.M., Morrice, D.J., Brunner, D.T. and Swain, J.J., eds). IEEE, Piscataway, NJ, pp. 1083–1090.
5. Franco, L.A. and Montibeller, G. (2010). Facilitated Modelling in Operational Research. European Journal of Operational Research, 205(3), pp. 489–500.