Funder
Institute for Oil Sands Innovation, University of Alberta
Imperial Oil Limited
Publisher
Springer Science and Business Media LLC
Subject
Mechanics of Materials,Civil and Structural Engineering
Reference43 articles.
1. Imperial Oil Resources Limited. (2018). Application for Kearl Mine’s Tailings Management Plan. Alberta Energy Regulator, Calgary, Alberta, T2P 0R4. http://web.archive.org/web/20230823204119/https://static.aer.ca/prd/documents/decisions/2018/20180716A.pdf
2. Xu, Y., Dabros, T., & Kan, J. (2013). Investigation on alternative disposal methods for froth treatment tailings-part 1, disposal without asphaltene recovery. Canadian Journal of Chemical Engineering., 91, 1349–1357. https://doi.org/10.1002/cjce.21823
3. Feng, R., & Qi, L. (2013). Froth treatment in athabasca oil sands bitumen recovery process: A review. Energy & Fuels., 27(12), 7199–7207. https://doi.org/10.1021/ef4016697
4. Hristova, E. J., & Stoyanov, S. R. (2021). Bitumen froth treatment in the transition region between paraffinic and naphthenic process conditions. Fuel, 286(2), 119385. https://doi.org/10.1016/j.fuel.2020.119385. ISSN 0016-2361.
5. Kirpalani, D. M., & Matsuoka, A. (2008). CFD approach for simulation of Bitumen froth settling process-Part I: Hindered settling of aggregates. Fuel, 87, 380–387. https://doi.org/10.1016/j.fuel.2007.05.018