Author:
Berman Piotr,Garay Juan A.
Reference14 articles.
1. H. Attiya, C. Dwork, N. Lynch and L. Stockmeyer, “Bounds on the time to reach agreement in the presence of timing uncertainty,” Proc. 23rd STOC, May 1991.
2. A. Bar-Noy and D. Dolev, “Families of Consensus Algorithms,” Proc. 3rd Aegean Workshop on Computing, pp. 380–390, June/July 1988.
3. A. Bar-Noy, D. Dolev, C. Dwork and H.R. Strong, “Shifting gears: changing algorithms on the fly to expedite Byzantine Agreement,” Proc. 6th PODC, pp. 42–51, August 1987.
4. P. Berman and J.A. Garay, “Optimal Early Stopping in Distributed Consensus,” IBM Research Report RC 16746, December 1990.
5. P. Berman, J.A. Garay and K.J. Perry, “Towards Optimal Distributed Consensus,” Proc. 30th FOCS, pp. 410–415, October/November 1989.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献