Author:
Al-Shihabi Sameh,Aldurgam Mohammad
Publisher
Springer Science and Business Media LLC
Reference49 articles.
1. Abido M, Elazouni A M (2011). Multi-objective evolutionary finance based scheduling: Entire projects’ portfolio. Journal of Computing in Civil Engineering, 25(1): 85–97
2. Abido M A, Elazouni A (2009). Improved crossover and mutation operators for genetic-algorithm project scheduling. In: IEEE Congress on Evolutionary Computation. IEEE, 1865–1872
3. Afshar A, Fathi H (2009). Fuzzy multi-objective optimization of finance based scheduling for construction projects with uncertainties in cost. Engineering Optimization, 41(11): 1063–1080
4. Al-Shihabi S T, AlDurgam M M (2017). A max-min ant system for the finance-based scheduling problem. Computers & Industrial Engineering, 110: 264–276
5. Alavipour S M R, Arditi D (2018a). Impact of contractor’s optimized financing cost on project bid price. International Journal of Project Management, 36(5): 808–818
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献