Author:
Wuni Ibrahim Yahaya,Shen Geoffrey Qiping,Hwang Bon-Gang
Publisher
Springer Science and Business Media LLC
Reference95 articles.
1. Adekunle T O, Nikolopoulou M (2016). Thermal comfort, summertime temperatures and overheating in prefabricated timber housing. Building and Environment, 103: 21–35
2. Assaf S A, Al-Hejji S (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4): 349–357
3. Azman M N A, Ahamad M S S, Majid T A, Yahaya A S, Hanafi MH (2013). Statistical evaluation of pre-selection criteria for industrialized building system (IBS). Journal of Civil Engineering and Management, 19(sup1): S131–S140
4. Baker J D (2016). The purpose, process, and methods of writing a literature review. AORN Journal, 103(3): 265–269
5. Baloi D, Price A D F (2003). Modelling global risk factors affecting construction cost performance. International Journal of Project Management, 21(4): 261–269
Cited by
36 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献