1. Achten H H (2002). Requirements for collaborative design in architecture. In: Proceedings of the 6th Design and Decision Support Systems in Architecture and Urban Planning—Part One: Architecture Proceedings, Avegoor, the Netherlands
2. Becerik-Gerber B, Rice S (2010). The perceived value of building information modeling in the U.S. building industry. Journal of Information Technology in Construction, 15: 185–201
3. Bolshakova V, Guerriero A, Carvalho H, Halin G (2019). Collective decision-making with 4D BIM: collaboration group persona study. In: Mutis I, Hartmann T, eds. Advances in Informatics and Computing in Civil and Construction Engineering. Cham: Springer, 455–462
4. Bolshakova V, Guerriero A, Halin G (2018). Identification of relevant project documents to 4D BIM uses for a synchronous collaborative decision support. In: Proceedings of Creative Construction Conference. Budapest, Hungary: Diamond Congress Ltd., 1036–1043
5. Bolshakova V, Halin G, Humbert P, Boton C (2017). Digital synchronous collaboration workspace and 3D interactions for an AEC project. Decision-making scenario evaluation. In: Luo Y, ed. Cooperative Design, Visualization, and Engineering, CDVE 2017. Cham: Springer, 10451: 168–176