Author:
Sharma Sameer,Gupta Deepak,Sharma Seema
Reference13 articles.
1. Anghinolfi, D., Paolucci, M.: Parallel machine total tardiness scheduling problem. Comput. Oper. Res. 3, 3471–3490 (2007)
2. Azizoglu, M., Kondacki, S., Omer, K.: Bicriteria scheduling problem involving total tardiness and total earliness penalties. Int. J. Prod. Econ. 23, 17–24 (1991)
3. Akker Vanden, J.M., Hoogeveen, J.A.: Minimizing the number of tardy jobs. Hand Book of Scheduling. Chap-man and Hall/CRC, Boca Raton, Florida (2004)
4. Chand, S.: Schneerberger: A note on single machine scheduling problem with minimum weighted completion time and maximum allowable tardiness. Naval Res. Logistic 33, 551–557 (1986)
5. Chen, C.L., Bulfin, R.L.: Scheduling a single machine to minimize two criteria: Maximum tardiness and number of tardy jobs. IIE Trans. 26, 76–84 (1994)
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献