1. R. P. Gerasymyak and V. A. Leschev, Analysis and Synthesis of Crane Electromechanical Systems [in Russian], SMIL, Odesa (2008).
2. R. P. Gerasymyak and O. V. Naidenko, “Peculiarities of control of the electric drive of the boom trolley mechanism during the slewing of a crane with a suspended load,” Elektromash. Elektroobl., 68, 11–15 (2007).
3. S. A. Kazak, Dynamics of Bridge Cranes [in Russian], Mashinostroenie, Moscow (2008).
4. E. V. Naidenko, “Electric drive control of horizontal motion of mechanisms with suspended cargo,” Elektromash. Elektroobl., 69, 17–22 (2007).
5. T. Campara, H. Bukvic, and D. Sprecic, “Ability to control swinging of payload during the movement of the rotary cranes mechanism,” in: Proc. 4th Int. Conf. on Intelligent Technologies in Logistics and Mecha-tronics Systems. Kaunas Univ. Technol Panevezys Inst. Kaunas. LITHUANIA (2009), pp. 52–55.