1. Australian Consumer and Competition Commission. (2005). Assessment of Telstra’s ULLS and LSS monthly charge undertakings, Draft decision, August 2005, Appendix C. Available at www.accc.gov.au .
2. Baron D., Myerson R. (1982) Regulating a monopolist with unknown cost. Econometrica 50: 1231–1262
3. Besanko D., Spulber D. (1992) Sequential equilibrium investment by regulated firms. Rand Journal of Economics 23(2): 153–170
4. Bowman, R. G. (2004). Response to WACC issues in commerce—Commissioner’s draft report on the Gas control Enquiry. Report prepared for PowerCo, June. Available at: www.comcom.govt.nz/RegulatoryControl/GasPipelines/ContentFiles/Documents/Submission%20-%20Powerco%20WACC%
5. Bowman, R. G. (2005). Queensland Rail—Determination of regulated WACC, Report, available at www.qca.org.au/www/rail/Sub_QRat-tach7_2005%20DAU%20Draft.pdf .