1. Abdul-Rahman H, Berawi MA, Berawi AR, Mohamed O, Othman M, Yahya IA (2006) Delay Mitigation in the Malaysian Construction Industry. J Constr Eng Manag 132:125–133.
https://doi.org/10.1061/(ASCE)0733-9364(2006)132:2(125)
2. Albattah M, Giron M, Goodrum P, Groves D, Hamrick D, Karimi H, Taylor T (2016) Is There a Demographic Craft Labor Cliff That Will Affect Project Performance?, Construction Industry Institute.
https://scholar.google.com/scholar?hl=en&q=+Is+There+a+Demographic+Craft+Labor+Cliff+that+Will+Affect+Project+Performance&btnG=&as_sdt=1%2C3&as_sdtp
= (accessed July 29, 2017)
3. Albattah MA, Goodrum PM, Taylor TRB (2015) Demographic Influences on Construction Craft Shortages in the U.S. and Canada, in: 5th International/11th Construction Specialty Conference, pp. 169–176.
https://doi.org/10.14288/1.0076372
4. Boktor J, Hanna A, Menassa CC (2014) State of Practice of Building Information Modeling in the Mechanical Construction Industry. J Manag Eng 30:78–85.
https://doi.org/10.1061/(ASCE)ME.1943-5479.0000176
5. J. Chalhoub, S. Alsafouri, Ayer SK (2018) Leveraging Site Survey Points for Mixed Reality BIM Visualization, in: Construction Research Congress 2018, pp. 326–335.
https://ascelibrary.org/doi/abs/10.1061/9780784481264.032
(accessed April 5, 2018)