Developing a new procurement model, using behavioural economics, to enable continuous improvement of productivity and better value in large UK infrastructure projects.

Author:

Perks Martin

Abstract

Global construction has been blighted by productivity inertia caused by behavioural bias for decades. While other industry sector productivity has grown more than fifteen-fold since 1960, construction has stagnated with no more than a seven to ten percent overall growth. McKinsey Global Institute’s report Reinventing Construction: A Route to Higher Productivity, reported infrastructure construction amongst a small group of outperforming market sub-sectors at 15 to 20 percent. This paper, which charts the development of a unique procurement model designed for high productivity, builds on that performance using behavioural insights to counter damaging and habitual biases. The new model changes trading relationships using a nudged ‘opt-out’ contract structure creating a different responsibility dynamic between client and supplier. A recognisable but different infrastructure construction procurement model to improve productivity using recognised behavioural economics and construction economics. Highways England was set up to run England’s strategic road network in 2015. The procurement model that resulted, Regional Delivery Partnerships can be refined for any infrastructure sector construction environment and sets up a key step forward in contracting based on integrated project delivery. Using a combination of counter bias strategies built from loss aversion and nudge theory this new construction procurement model uses ‘opt-out’ from lean construction to drive higher productivity. By setting up an integrator, to create an integrated project team, Regional Delivery Partnerships uses loss aversion as the motivational key to better innovation. It empowers the integrator to counter uniqueness bias and find and eradicate waste (process time and money) to enhance productivity. Reward is aligned to both optimised efficient design and high productivity working. As 100% of budget underspend can be kept rewarding the integrator, the potential of not achieving this triggers loss aversion and motivates change using the principles of escalation of commitment in favour of the client. Performance data is also used to motivate using reduced acquisition costs from secondary competition, long held as an inefficient market overhead.Using recognised pragmatic academic techniques, and constructionism; choice architectures were remodelled into a new outcome and value focused procurement model. Using applied research, the team used processes and techniques to develop, build, test, and deploy the model in open market competition. It can be used by any infrastructure sector construction client to replicate a sector specific version of Regional Delivery Partnerships that changes trading choice architecture towards higher productivity.

Publisher

Pontificia Universidad Catolica de Chile

Subject

Building and Construction,Civil and Structural Engineering

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Financial resource scheduling and road construction projects performance in Nairobi Metropolitan, Kenya;International Journal of Research in Business and Social Science (2147- 4478);2024-06-11

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3