ASSESSMENT OF FACTORS AFFECTING ACCURACY OF COST ESTIMATION IN PUBLIC BUILDING CONSTRUCTION PROJECTS IN WESTERN OROMIA REGION, ETHIOPIA

Author:

Chimdi Jifara,Girma Sisay,Mosisa Alemu,Mitiku Degefe

Abstract

Construction projects are getting progressively complex and their scales are getting sophisticated. Along these lines, it is getting more problematic to finish the projects inside planned cost limits. In Oromia public building construction projects these problems were raised as a typical challenge. Hence, evaluation of factors affecting the accuracy of cost estimation in public projects was the aim of this study. Both quantitative and qualitative methods were utilized for information assortment. Relative Importance Index (RII) was utilized for information investigation. Totally sixty -two variables were investigated and the best five most significant were selected by this assessment based on the average view of respondents. These significant factors are; Material price/accessibility /source /quality /imports, Experience and ability of the consultant, Variability in the Economy of the country, and financial conditions of client.  Spearman's rank correlation coefficients (rho) investigation was conducted by the assistance of SPSS 20 version for a testing level of connections among respondents on the positioning of the factors affecting the accuracy of cost estimation. Spearman’s rank correlation results were 0.823 among Clients and Consultants, 0.813 among clients and contractors, and 0.802 among Consultants and Contractors. The outcome shows that the rate of the rank correlations was a high positive number, which implies there is a positive connection between them on the ranking of factors disturbing the accurateness of cost estimation in public building construction projects in western Oromia.

Publisher

UNIMAS Publisher

Subject

General Medicine

Reference16 articles.

1. [1] Barzandeh, M., 2011. Accuracy of estimating techniques for predicting residential construction costs-a case study of an Auckland residential construction company, Report for Industry Project CONS No. 7819.

2. [2] Larson, E.W. and Gray, C.F. (Ed.), 2010. "Project management", The Managerial Process, 5th edition.

3. [3] Dysert, L. R., 2006. Is "Estimate Accuracy" an Oxymoron? 2006 AACE International Transactions, 1-5.

4. [4] Ponte, D.M. 2009. Minimizing risks associated with construction cost estimates. Available: http://asceinsurance.com/Portals/dnn.asceinsurance.com/forms/pl/articles/ ASCE-PL-EstimateRisks-Article-F.pdf.

5. [5] Gupta, K.P., 2009. Cost management: Measuring, monitoring and motivating performance. New Delhi: Global India Publications.

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3