Affiliation:
1. DRA Pyestock, Farnborough, UK
2. Oxford University, Oxford, UK
Abstract
The Isentropic Light Piston Facility (ILPF) at Pyestock has been upgraded to include a single stage, high pressure turbine. All major non-dimensional parameters are accurately scaled during the 0.4s run time, enabling heat transfer and aerodynamic measurements to be made at engine representative conditions. The ILPF was previously an annular cascade facility. This paper describes the design and integration of the rotor module and the results of the commissioning tests. An important feature is a novel, patented, turbobrake which is shown to maintain the turbine at a constant speed during the run.
Publisher
American Society of Mechanical Engineers
Cited by
21 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献