1. ASHRAE, 1996, “ASHRAE Guideline 1-1996: The HVAC Commissioning Process,” American Society of Heating, Refrigerating and Air-Conditioning Engineers, Atlanta, GA.
2. Haasl, T., and Sharp, T., 1999, A Practical Guide for Commissioning Existing Buildings, Portland Energy Conservation, Inc., and Oak Ridge National Laboratory for U.S. DOE, ORNL/TM-1999/34.
3. Liu, M., and Claridge, D. E., 1998, “Use of Calibrated HVAC Models to Optimize System Operation,” ASME J. Sol. Energy Eng., 120, pp. 131–138.
4. Liu, M., and Claridge, D. E., 1999, “The Maximum Potential Energy Savings from Optimizing Cold and Hot Deck Reset Schedules for Dual Duct VAV Systems.” ASME J. Sol. Energy Eng., 121, pp. 171–175.
5. Liu, M., Houcek, J., Athar, A., Reddy, A., and Claridge, D. E., 1994, “Identifying and Implementing Improved Operation and Maintenance Measures in Texas LoanSTAR Buildings,” ACEEE 1994 Summer Study on Energy Efficiency in Buildings Proceedings: Commissioning, Operation and Maintenance, 5, American Council for an Energy Efficient Economy, Washington, DC, pp. 153–165.