Offshore Logistics: Scenario Planning and Installation Modeling of Floating Offshore Wind Projects

Author:

Torres Esperanza Susana1ORCID,Thies Philipp R.2ORCID,Lawless Mark3

Affiliation:

1. The University of Edinburgh EPSRC and NERC Industrial Centre for Doctoral Training in Offshore Renewable Energy (IDCORE), Graduate School of Engineering, , Edinburgh EH9 3FB , UK

2. University of Exeter Department of Engineering, Faculty of Environment, Science and Economy; Renewable Energy Group, , Penryn Campus, Treliever Road, Penryn TR10 9FE , UK

3. JBA Consulting , 1 Broughton Park, Skipton, North Yorkshire BD23 3FD , UK

Abstract

AbstractThe offshore installation, logistics, and commissioning activities are currently estimated to make up 20% to 30% of the capital expenditures (CAPEX) of offshore wind projects. Technical and geographical factors affect both the CAPEX during construction and the installation schedule, such as a lack of supporting port infrastructure, the availability of specialized vessels, the distance from the wind farm to shore, accessibility, water depths, and seabed conditions. In addition, there are significant risks during the construction phase, such as uncertain durations due to the sensitivity of marine operations to weather conditions. Identifying supply chain requirements is critical in the early stages of project planning in order to avoid time delays and cost overruns during the transport and installation process. This study explores and analyzes the logistic requirements and installation methods of a floating offshore wind (FOW) technology. Using an advanced forecasting and decision support tool, realistic case scenarios are simulated at a variety of potential sites for FOW deployment across the UK. Technical risks associated with installation strategies are identified and classified. The results provide a comparison of key installation performance indicators of each case scenario (e.g., installation rate per wind turbine, weather downtime). This study is of interest to researchers, offshore wind project developers, service providers, and other key stakeholders seeking to optimize planning and logistics to drive down CAPEX costs, reduce the construction downtime, and minimize risks during marine operations.

Funder

Engineering and Physical Sciences Research Council

Publisher

ASME International

Reference32 articles.

1. Hywind Scotland Pilot Park Project Plan for Construction Activities;Statoil,2017

2. Offshore Wind in Europe. Key Trends and Statistics 2020;WindEurope,. 2021

3. A 2030 Vision for European Offshore Wind Ports: Trends and Opportunities;WindEurope Intelligence Platform,2021

4. Power Sector, Supply Chain, Jobs, and Emissions Implications of 30 Gigawatts of Offshore Wind Power by 2030;Lantz,. 2021

5. Global Offshore Wind Report 2020;Global Wind Energy Council,. 2020

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3