Design, Development and Testing of a Gas Turbine Steam Injection and Water Recovery System

Author:

Lupandin Vladimir V.1,Romanov Victor I.2,Krivutsa Villy A.2,Lupandin Viktor V.2

Affiliation:

1. “Orenda Aerospace Corporation”, Mississauga, ON, Canada

2. SPE “Mashproekt”, Nikolayev, Ukraine

Abstract

The paper describes experience gained in design and development of gas turbine units for electrical generator or mechanical drive application featuring steam injection into the gas turbine combustion chamber combined with a water recovery system from the gas turbine exhausted gases (units are known as “Aquarius”). Prototype test rigs, and test results on prototype and commercial units are discussed. These units have power output of 16 MW (“Aquarius-16”) and 25 MW (“Aquarius-25”) with efficiency of 45% and 43%, ISO respectively. Special test rigs were designed and built to prove concept of water recovery from gas turbine exhausted gases and to study contact condenser operation over a wide range of ambient temperatures. The first prototype test rig, comprising of SPE “Mashproekt” GT 100K gas turbine engine, 100 kW electrical generator, waste-heat recovery boiler and contact type condenser started operation in 1986. To the Author’s knowledge there is one more plant in operation with water recovery from February 1993 located inside the “CARROZZERIA BERTONE” plant near Turin, Italy (Ennlo Macchi, Aurelio Poggio “A COGENERATION PLANT BASED ON A STEAM INJECTION GAS TURBINE WITH RECOVERY OF THE WATER INJECTED: DESIGN CRITERIA AND INITIAL OPERATING EXPERIENCE”, ASME paper 94-GT-17). The second prototype unit, “Aquarius-25”, comprising of SPE “Mashproekt” steam injected GT 15000S gas turbine engine, waste heat recovery boiler, contact water condenser and a generator (power output of 25 MW and efficiency of 43%) is currently in operation. This unit has accumulated more than 12,000 fired hours in development tests since January 1995. “Aquarius-16” - commercial mechanical drive unit with 16 MW power output and efficiency of 45% was built and factory tested in 1998 (more than 1600 fired hours). It was built around the SPE “Mashproekt” GT 10000S steam injected gas turbine engine. This unit is scheduled to start commercial operation at UKRGASPROM “Stavishenskaya” gas compression station (Ukraine) in 2001.

Publisher

American Society of Mechanical Engineers

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3