1. Agarwal, M., & Kumar, A. (1981). Analysis of a repairable redundant system with delayed replacement. Microelectronics Reliability, 21(2), 165 – 171.
2. Agnihotri, R.K., Kumar, V., & Asari, M.A. (1993). Stochastic analysis of a redundant system with two type of failure. Microelectronics Reliability, 33(10), 1467-1471.
3. Chib, R., Joorel, J.P.S., & Sharma, V. (2014). Profit analysis of a two-unit priority system with two types of repair facility and proviso of rest. International Journal of Statistics and Reliability Engineering, 1(1), 69-81.
4. Chib, R., Joorel, J.P.S., & Sharma, V. (2016): Analysis of a two non-identical unit cold standby system with partial and total failure and priority, Proceedings of the 10th INDIACom-2016; IEEE Conference ID: 37465 International Conference on Computing for Sustainable Global Development, 6304-6308.
5. Chung, W.K. (1987). Reliability analysis of a repairable parallel-system with standby involving human error and common cause failures. Microelectronics Reliability, 27(2), 269-271.