Performance of geosynthetic-reinforced pile-supported embankment on soft marine deposit

Author:

Chen Ren-Peng1,Liu Qi-Wei2,Wang Han-Lin3ORCID,Liu Yuan2,Ma Qing-Lei4

Affiliation:

1. Professor, Ministry of Education Key Laboratory of Building Safety and Energy Efficiency, College of Civil Engineering, Hunan University, Changsha, P. R. China

2. PhD candidate, Ministry of Education Key Laboratory of Building Safety and Energy Efficiency, College of Civil Engineering, Hunan University, Changsha, P. R. China

3. Research Assistant Professor, Department of Civil and Environmental Engineering, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong, P. R. China; formerly, Research Fellow, Ministry of Education Key Laboratory of Building Safety and Energy Efficiency, College of Civil Engineering, Hunan University, Changsha, P. R. China (corresponding author: )

4. Postgraduate student, Ministry of Education Key Laboratory of Building Safety and Energy Efficiency, College of Civil Engineering, Hunan University, Changsha, P. R. China

Abstract

This study presents field investigations of a geosynthetic-reinforced pile-supported embankment for a transformer substation constructed on a soft marine deposit. The tests were performed following three procedures: construction, surcharge loading and consolidation. The soil stress, the accumulative settlement and the excess pore pressure at different locations in the field were monitored. The results indicated that, with the construction height increasing, the excess pore pressure caused by pile installations in the foundation soil decreased slightly and the pile–subsoil differential settlement increased insignificantly. When the differential settlement was relatively small, the soil arching effect developed rapidly as the differential settlement increased, also showing a partially mobilised characteristic. This partially mobilised arching was weakened under surcharge loading. During the consolidation procedure, the excess pore pressure dissipated remarkably, leading to a noticeable increase in the differential settlement. When sufficient differential settlement was reached, the partially mobilised soil arching developed to the fully mobilised state. At this state, the load-sharing ratio or the pile efficacy (ratio of load borne by the pile cap to the total load) remained steady. Furthermore, for the fully mobilised arching, the pile efficacy was well predicted by four analytical models.

Publisher

Thomas Telford Ltd.

Subject

Earth and Planetary Sciences (miscellaneous),Geotechnical Engineering and Engineering Geology

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370