Affiliation:
1. Tony Gee and Partners Cobham, formerly Arup Geotechnics London, UK
Abstract
Eurocodes were used for the design of a new metro, for which the contractor's design was undertaken largely between 1996 and 1999, when the Eurocodes were in their infancy. This paper discusses the experience, the difficulties encountered and the benefits gained by the project, with particular reference to the geotechnical design of the underground stations. Eurocodes 1, 2 and 7 were used for the design of the retaining walls for the deep stations. Two design parameters created challenges for the structural design of the reinforced concrete embedded retaining walls: a restriction on the maximum allowable crack width, and a large cover to the reinforcement, required by the construction method. Benefits were gained by using the observational method.
Subject
Earth and Planetary Sciences (miscellaneous),Geotechnical Engineering and Engineering Geology
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Editorial;Proceedings of the Institution of Civil Engineers - Geotechnical Engineering;2014-04
2. New Railway Connection below Brussels Airport;IABSE Congress, Chicago 2008: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure;2008