Affiliation:
1. University of the Free State, Bloemfontein, South Africa
2. ITMO University, St. Petersburg, Russia
3. The Israel Electric Corporation, Haifa, Israel
Abstract
At many instances, it is more cost-effective to terminate operation of a system than to wait for its failure or completion of a mission. Usually, completion of a mission (contract) results in an additional reward, whereas premature termination results in a penalty. However, the system failure during the mission can incur considerable expenses. As the failure probability increases with the mission time, this can make the mission completion too risky and not beneficial. This article analyzes the optimal mission duration for non-repairable systems subject to shocks and internal failures. Under certain assumptions, an optimal time of mission termination is obtained. It is shown that, if for some reason, the termination is not technically possible at this optimal time, the mission should be terminated within a specific time interval and, if this is not possible, it should not be terminated beyond this interval. Illustrative examples are presented.
Subject
Safety, Risk, Reliability and Quality
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献