Affiliation:
1. School of Mechanical Engineering, Hefei University of Technology, Hefei, China
2. Key Laboratory of Green Design and Manufacturing of Mechanical Industry, Hefei University of Technology, Hefei, China
Abstract
With the growth of environmental awareness, remanufacturing and sustainable manufacturing have become hot issues. Disassembly is the first step and critical activity in remanufacturing. Traditional disassembly sequence planning (DSP) focusses on sequential disassembly. However, it is inefficient for complicated products because only one manipulator is employed to execute disassembly operations. Thus, this work focusses on parallel DSP (PDSP) and proposes a selective parallel disassembly sequence planning (SPDSP) methodology, which performs disassembly compared to sequential DSP and PDSP. In this paper, a mathematical model is used to describe the constraint and precedence relationships, and a parallel sequence model is designed for parallel disassembly. A novel hybrid genetic algorithm (NHGA) based-multi-objective model of SPDSP is proposed for optimisation. In this model, two indicators are integrated: disassembly time (including basic disassembly time, tool exchange time and direction change time) and disassembly costs. A transmission box is used as an instance, and a comparison with conventional genetic algorithm (GA), simulated annealing (SA) and tabu search (TS) is made to validate the practicality of the proposed methodology.
Funder
2018 Open Research Fund by Jiangsu Key Laboratory of Recycling and Reuse Technology for Mechanical and Electronic Products
National Natural Science Foundation of China
Subject
Industrial and Manufacturing Engineering,Mechanical Engineering
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献