Affiliation:
1. College of Mechanical and Electrical Engineering, Nanjing University of Aeronautics and Astronautics, Nanjing, China
Abstract
In the current manufacturing environment, orders began to show trends in small batches and multiple varieties. Production workshops are expected to be more flexible and agile. This paper proposes a dynamic control system for the processing workshop based on the multi-agent architecture. The workshop layer is divided into multiple “processing cells” according to function. Machine agents and part agents are designed to achieve distributed control. In this paper, disturbances caused by random tasks to production are considered. A dynamic task dispatching mechanism based on the scrolling time window is investigated. When dispatching events occur, the machine agents and part agents determine the connection value between them through negotiation. An arbitration agent is designed to implement the dispatching through value matching. Finally, an actual experiment is carried out to verify the effectiveness of this dynamic control system.
Funder
National Natural Science Foundation of China
National Key R&D Program of China
jiangsu provincial key research and development program
Subject
Industrial and Manufacturing Engineering,Mechanical Engineering
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献