Affiliation:
1. State Key Laboratory of Mechanical Transmission, Chongqing University, Chongqing, China
Abstract
A new mathematical method and an optimization model are proposed in this study to solve the tool requirement and pre-scheduling optimization problems involved in the tool flow system of digital workshops. This model aims to minimize the system makespan under the constraint of the tool purchase cost. A double-layer genetic algorithm based on the heuristic algorithm is then developed. This algorithm not only combines the advantages but also avoids the weaknesses of the two algorithms. Finally, a case study is conducted to validate the effectiveness and superiority of the proposed algorithm and the tool-machine dual-resource pre-scheduling optimization model.
Funder
National Natural Science Foundation of China
Subject
Industrial and Manufacturing Engineering,Mechanical Engineering
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献