The study of intelligent scheduling algorithm oriented to complex constraints and multi-process roller grinding workshop

Author:

Li Hanyang123,Wang Chao4,Jiang Sheng3,Liu Sheng2,Rong Yiming1,Li Xuekun4ORCID

Affiliation:

1. Department of Mechanical and Energy Engineering, Southern University of Science and Technology, Shenzhen, China

2. School of Power and Mechanical Engineering, Wuhan University, Wuhan, China

3. Hiecise Innovative Material Science and Technology Co., Ltd, Jiangsu, China

4. Department of Mechanical Engineering, Tsinghua University, Beijing, China

Abstract

Roller grinding workshop is a typical multi-unit and multi-task manufacturing scenario, which is aimed to repair the surface damage of the rollers caused by the rolling process, so that the rollers can be reused. Due to the process complexity of roller grinding workshop and the large volume and weight of the roller, hoisting and transportation mode with multiple cranes is required. Consequently, the scheduling of the roller grinding workshop needs to consider both the task sequencing in time and the noninterference of the multi-crane trajectory in space. In this paper, the intelligent scheduling of roller grinding workshop is studied based on the characteristics of complex tasks and space-time coupling constraints. Firstly, the scheduling basis is established based on priority rules and process constraints. In order to solve the scheduling problem under the space-time coupling constraints, the position coordinate system is established, and then the algorithms of crane position tracking and cooperative motion without interference are developed. Further, considering the transportation time of crane and its out of sync time point with the processes, the intelligent decision and scheduling algorithm are developed based on the dynamic priority strategy defined to realize scheduling, including time decision, crane decision, and process decision. With the developed intelligent scheduling algorithm applied, the simulation of the roller grinding workshop is conducted under three combinations of priority strategy and noninterference strategy to verify algorithm performance. Under the guarantee of crane noninterference during the full production, the efficiency is improved by 22.1% compared with the existing processing mode of industry. Additionally, EPTR (effective process time rate) based on dynamic priority strategy and noninterference strategy B is up to 100% to avoid intervals between two processes in the scheduling. The dynamic priority developed in this paper reveals more efficiency than MOR principle, while with the strategy B the CUR (crane utilization rate) can be improved more than 20% under the condition of enough machines which facilitates to obtain shorter makespan than strategy A. The intelligent scheduling algorithm developed guarantees the effectiveness and rationality of scheduling with multi-unit and multi-task under the complex constraints. Finally, in order to realize the automatic and intelligent operation of the roller grinding workshop, the management software of the roller grinding workshop is developed by integrating the intelligent scheduling algorithm, which realizes the intelligent production, monitoring, and management of the roller grinding workshop during the full production cycle.

Funder

Important National Science and Technology Specific Projects

national key research and development program of china

science, technology and innovation commission of shenzhen municipality

Publisher

SAGE Publications

Subject

Mechanical Engineering

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3