Affiliation:
1. College of Mechanical Engineering, Donghua University, Shanghai, China
Abstract
As the most important core process in the dyeing and finishing workshop of knitting companies, the dyeing process has the characteristics of multi-variety, small-batch, parallel machine processing of multiple types, and high cost in equipment cleaning, which render the dyeing scheduling problem a bottleneck in the production management of a dyeing and finishing workshop. In this paper, the dyeing process scheduling problem in dyeing and finishing workshops is described and abstracted, and an optimized mathematical model of dyeing scheduling is constructed with the goal of minimizing the delay cost and switching cost. Constraints such as multiple types of equipment, equipment capacity, weights of orders and equipment cleaning time are considered. For the sub-problem of equipment scheduling in the dyeing scheduling problem, a heuristic rule that considers equipment utilization and order delay is proposed. For the sub-problem of order sorting of the equipment in the dyeing scheduling problem, a hybrid genetic algorithm with a variable neighbourhood search strategy has been designed to optimize sorting. The algorithm proposed in this paper has been demonstrated via case simulation to be effective in solving the scheduling problem in dyeing and finishing workshops.
Funder
national natural science foundation of china
Subject
Applied Mathematics,Control and Optimization,Instrumentation
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献