1. I. Ukkas, "Faktor-Faktor Yang Mempengaruhi Produktivitas Tenaga Kerja Industri Kecil Kota Palopo," Kelola: Journal of Islamic Education Management, vol. 2, no. 2, Oct. 2017, doi: 10.24256/kelola.v2i2.440.
2. M. B. Santos, "The Integration of Six Sigma and Lean Manufacturing," Lean Manufacturing and Six Sigma - Behind the Mask, Feb. 2020, doi: 10.5772/intechopen.87304.
3. H. Ponda, N. F. Fatma, and I. Siswantoro, "Usulan Penerapan Lean Manufacturing Dengan Metode Value Stream Mapping (VSM) Dalam Meminimalkan Waste Pada Proses Produksi Ban Motor Pada Industri Pembuat Ban," Heuristic, pp. 23-42, Apr. 2022, doi: 10.30996/heuristic.v19i1.6568.
4. W. Anggraini, M. Hutagalung, Nofirza, and T. Nurainun, "Value Stream Mapping pada Proses Produksi Plywood untuk Meningkatkan Process Cycle Efficiency," J. Semin. Nas. Teknol. Inf., vol. 1, pp. 507 - 516, 2018.
5. A. Afif, "Analisis Waste pada Industri Mebel dengan Menggunakan Pendekatan Lean Manufacturing (Studi Kasus: CV Jati mas Semarang," in Departemen Teknik Industri, Fakultas Teknik,Universitas Diponegoro Jl. Prof. H, Soedarto, SH., Tembalang, Semarang, 2016.