Affiliation:
1. Department of Industrial Engineering, Sanandaj Branch, Islamic Azad University, Sanandaj, Iran
Abstract
This paper formulates a new time–cost trade-off problem under some uncertainties for a multi-phase project. To do this, a new approach is proposed based on goal programming in compliance with scenario-based stochastic optimization formulation. To the best of our knowledge, this problem has not been extensively treated in the literature. Computational results show the applicability and usefulness of the proposed method.
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献