Affiliation:
1. Department of Industrial Engineering & Management, Peking University, Beijing 100871, P. R. China
Abstract
In this paper, we address the scheduling issues in a class of maintenance, repair and overhaul systems. By considering all key characteristics such as disassembly, material recovery uncertainty, material matching requirements, stochastic routings and variable processing times, the scheduling problem is formulated into a simulation optimization problem. To solve this difficult problem, we developed two hybrid algorithms based on nested partitions method and optimal computing budged allocation technology. Asymptotic convergence of these two algorithms is proved and numerical results show that the proposed algorithms can generate high quality solutions which outperform the performance of many heuristics.
Publisher
World Scientific Pub Co Pte Lt
Subject
Management Science and Operations Research,Management Science and Operations Research
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献