Energy potential assessment and techno–economic analysis of micro hydro–photovoltaic hybrid system in Goda Warke village, Ethiopia

Author:

Feyissa Ephrem Assefa1ORCID,Tibba Getachew Shunki2,Binchebo Tarekegn Limore3,Bekele Endeshaw Alemu4,Kole Adem Tibesso5

Affiliation:

1. Department of Mechanical Engineering, Bule Hora University , Bule Hora , Ethiopia

2. Agro Technical and Technology College, Menschen fuer Menschen Foundation , Harar , Ethiopia

3. Faculty of Mechanical Engineering, Jimma Institute of Technology , Jimma , Ethiopia

4. Department of Thermal Technology, Silesian University of Technology , Gliwice , Poland

5. Jimma Agricultural Engineering Research Center, Jimma, Oromia Agricultural Research Institute , Ethiopia

Abstract

Abstract Rural Ethiopia has significant untapped potential for hydro and solar energy generation systems. However, challenges arise from seasonal variations and unfavourable topographic positions of flowing rivers, hindering the efficient exploitation of these resources. Despite the country’s abundance in hydro and solar energy resources, >75% of the population still lack access to electricity from the national grid. This work deals with energy resource potential assessment and techno–economic analysis of micro hydro–photovoltaic (PV) hybrid systems, considered in the case study of Goda Warke village, located in the Yaya Gulele district. A novel framework is proposed that utilizes the Natural Resource Soil Conservation Service curve number method to assess the energy potential of micro-hydro energy in ungauged basins, specifically at the exit point of the Girar River basin catchment. The average monthly flow rate in the basin is 0.975 m3/s, while the area exhibits a solar radiation potential of 5.39 kWh/m2/day. Energy policy promotes expanding access to modern energy sources and utilization of indigenous energy resources. Simulation results indicate that the hydro/PV/diesel generator (DG)/battery and hydro/PV/battery systems are the most optimal choices based on net present cost, with the inclusion of a DG for economic comparison. Micro-hydro energy covers most of the electric load in the area, achieving a capacity factor of 47.5%. The cost of energy and net present cost were found to be sensitive to variables such as the price of diesel fuel, pipe head loss, and the growth of the village load. The optimized system demonstrated a hydro energy potential of 1405.37 MWh/year and a PV energy output of 274.04 MWh/year, resulting in a levelized cost of energy of 0.0057 and 0.049 $/kWh for the hydro and PV components, respectively.

Publisher

Oxford University Press (OUP)

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3