Author:
Gouweleeuw B. T.,Thielen J.,Franchello G.,De Roo A. P. J.,Buizza R.
Abstract
Abstract. Following the developments in short- and medium-range weather forecasting over the last decade, operational flood forecasting also appears to show a shift from a so-called single solution or 'best guess' deterministic approach towards a probabilistic approach based on ensemble techniques. While this probabilistic approach is now more or less common practice and well established in the meteorological community, operational flood forecasters have only started to look for ways to interpret and mitigate for end-users the prediction products obtained by combining so-called Ensemble Prediction Systems (EPS) of Numerical Weather Prediction (NWP) models with rainfall-runoff models. This paper presents initial results obtained by combining deterministic and EPS hindcasts of the global NWP model of the European Centre for Medium-Range Weather Forecasts (ECMWF) with the large-scale hydrological model LISFLOOD for two historic flood events: the river Meuse flood in January 1995 and the river Odra flood in July 1997. In addition, a possible way to interpret the obtained ensemble based stream flow prediction is proposed.
Subject
General Earth and Planetary Sciences,General Engineering,General Environmental Science
Cited by
86 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献