A Review of Minimizing Delay in Construction Industries

Author:

Khoiry Muhamad Azry,Kalaisilven Suhaniya,Abdullah Azlina

Abstract

Construction is an important industry to determine the development of a country. However, this industry faced delay issues caused by various factors that affect proper construction project. Hence, minimizing delay in construction should be focused on overcoming the delay issue. Thus, the objective of this study is to critically review the main criteria of minimizing delay based on the most significant items that suggested in the previous journals. This paper reviewed 47 journals that studied the issues of delays in construction projects. Through this study, the authors have classified four main criteria for minimizing delays, which are; management, interpersonal, technical and technology. Management ensures the proper manage of time, financial and control system in construction to minimize delay. While, interpersonal promote a good relationship between construction parties, hire of competent and skilled labour and responsibility of the owner to avoiding delay. Besides, technical ensure the quality of project and technology could improve the productivity of construction based on fourth industrial revolution development in the construction field. Thus, this study contributes to construction parties able to focus on elements to overcome the delay issue in they faced and applied the ideas based on the element to minimize delay in the construction project.

Publisher

EDP Sciences

Reference50 articles.

1. Analyzing delay causes in Egyptian construction projects

2. Elharare F., Elhaniash A., and Stevovic S., “Towards factors affecting delays in construction projects : A case of Libya,” vol. 2, no. 1, pp. 2013-2016, 2016.

3. Significant factors causing delay in the UAE construction industry

Cited by 6 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Delay Minimising Measures Used on Road Construction Projects in South Africa;Towards a Sustainable Construction Industry: The Role of Innovation and Digitalisation;2023

2. Investigation on factors causing construction delay and their effects on the development of Oman’s construction industry;EUREKA: Physics and Engineering;2022-11-29

3. DfMA for a Better Industrialised Building System;Buildings;2022-06-09

4. Critical Delay Factors in Typical Physical Project: The Case of Ministry of Home Affairs in Malaysia;Journal of Construction in Developing Countries;2022

5. Causes of Delay in Smart and Complex Construction Projects;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction;2021-11

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3