Author:
Burkova Irina,Titarenko Boris,Hasnaoui Amir,Titarenko Roman
Abstract
Resource allocation problems in project management are notoriously complex. Therefore the development of efficient algorithms for solving various specific cases is a real problem. This paper shows a specific case of the problem, where a program has a particular structure. The resource allocation problem in such a program is reduced to classical Johnson’s problem or job-shop scheduling problem. Effective solution methods, by way of reducing to maximum flow problems, are suggested for some types of resources. For other cases, heuristic rules are developed, with a description of the situations in which these rules allow good enough solutions to be obtained.
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献