Abstract
The construction procedure of the gas storage well is complicated, and each technical index request is extremely high, does not allow any mistake. The well deviation is difficult to control. Because of the large dip angle of formation, it is difficult to ensure the wellbore quality by conventional anti-deviation measures, and the change of well deviation and azimuth can not be monitored at any time. So it's almost impossible for conventional anti-incline measures to satisfy the design. In the upper large hole section, the tower pendulum bha is used. In the section below the second open hole, the MWD steering system is used to prevent deviation and reduce deviation, and in the second open large hole section, the slim hole is used first, after reaming, the difficulty of deviation control is reduced, the ROP is increased, and the contradiction between wellbore quality and ROP can be solved by using MWD steering system to prevent deviation and straighten, because the casing and the surface casing and the production casing belong to the large diameter thick wall casing, the rigidity is very big, and the casing is also the abnormal oil drilling pipe, this well summarizes the experience, after strengthening the well opening measures, the safe and smooth running.
Reference17 articles.
1. Optimization and effectiveness of plugging technology for old wells in oil and gas reservoir underground gas storage. Chemical Engineering and Equipment Journal 2018.