Author:
Shiau Yau-Ren,Lo Fang-Yi,Ko Po-Cheng
Abstract
To prevent electrical shock accidents in construction sites, the present researchers used portable electrical equipment as an example to plan a preconstruction early intervention mechanism that can be used to conduct various inspections of portable electrical devices. This study used narrative text analysis for data collection and compilation. The researchers analyzed 41 real electrocution death cases involving portable electric equipment as the electrocution medium in the Taiwanese construction industry and identified hazard factors that cause electrocution from the case summaries. Then, the IDEF3 was used to integrate and construct a model for the portable electrical equipment inspection flowchart of the early intervention mechanism as a safety inspection system to prevent electrocution in construction engineering units. This study revealed hazard factors and management omissions related to electrocutions caused by portable electrical equipment. To protect workers and strengthen the safety of the construction site, this study proposed of an electric shock prevention early intervention mechanism for portable electric equipment in construction projects. Various inspections should be conducted before equipment is brought on site for construction operations to ensure the safety of electrical equipment and reduce electrocution risks. This study also established a visualization mechanism for the visual qualification label of portable electrical equipment. This mechanism is conducive to strengthening safety management.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. An Improved Industrial Analysis of Electrical Equipment using Deep Learning based Approach;2023 IEEE International Conference on Integrated Circuits and Communication Systems (ICICACS);2023-02-24