Abstract
In this paper we propose to solve a single machine scheduling problem which has to undergo a periodic preventive maintenance. The objective is to minimize the weighted sum of the completion times. This criterion is defined as one of the most important objectives in practice but has not been studied so far for the considered problem. As the problem is proven to be NP-hard, and a mathematical model is proposed in the literature, we propose to use General Variable Neighborhood Search algorithm to solve this problem in order to obtain near optimal solutions for the large-sized instances in a small amount of computational time.
Subject
Management Science and Operations Research,Computer Science Applications,Theoretical Computer Science
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献