Author:
Wang Chao,Ji Liang,Song Peibing,Hu Xin,Sun Jiahui
Abstract
Due to the great potential of large cascade hydropower stations on power generation, long-term scheduling of large cascade hydropower stations (LSLCHS) plays an important role in electrical power system. As more and more concentrations focused on the optimal operation of large cascade hydropower stations, the LSLCHS has been taken into a multi-dimensional, non-convex and non-linear optimization problem due to its complicated hydraulic connection relationships and varieties of complex constraints with considering its power generation, shipping and ecological characteristics. In order to solve this problem, a strategy of solution rapid adjustment regarding the principle of monotone principle is proposed accordingly. The simulation results show that the proposed method is an efficient for solving joint optimization dispatch model of cascade hydropower stations with fast convergent rate, strong robustness.