1. H. Liu, C. Xia, H. Zhu, Studies on tunnel damage, Chinese Journal of Underground Space and Engineering, 3 (2007) 947-953.
2. DB11/T718-2010, The Technical Specification of Facilities Maintenance for Urban Railway Transit.
3. H. Huang, J. Du, X. Xie, Simulation of GPR detecting of grouting materials behind shield tunnel segments, Chinese Journal of Geotechnical Engineering, 29 (2007) 243-248.
4. C. Liu, H. Fan, G. Zhang. The Application of the" BICS" for Repair Segment Crack, Urban Construction Theory Research, 3 (2013) 121-122.
5. C. Liu, H. Fan, Repair and numerical analysis of damaged metro lining segments, Chang'an University Postgraduate Proceedings, (2011).