Affiliation:
1. University of Zielona Gora
2. Slovak University of Technology in Bratislava
Abstract
This paper investigates various problems associated with the parameter specification for material requirements planning (MRP) in a typical ERP system. The choice of a suitable MRP procedure and its parameters can reduce excessive quantities of materials and, consequently, cost. The proposed approach is dedicated for MRP procedure based on the forecasting of material demand and inventory that can be obtained with the use of techniques for nonlinear function identification, such as fuzzy-neural system and neural networks. An example is presented which compares the different forecasting models for material demand and inventory.
Publisher
Trans Tech Publications, Ltd.
Reference7 articles.
1. M.M. Yenisey: A flow-network approach for equilibrium of material requirements planning, Int. J. Production Economics Vol. 102 (2006), pp.317-332.
2. G. Ioannou and S. Dimitriou: Lead time estimation in MRP/ERP for make-to-order manufacturing systems, Int. J. Production Economics Vol. 139 (2012), pp.551-563.
3. H. -G. Lee, H. -B. Na, K. Shin, H. -I. Jeong and J. Park: Performance improvement study for MRP part explosion in ERP environment, Int J Adv Manuf Technol Vol. 35 (2007), pp.309-324.
4. M. Relich: Knowledge acquisition for new product development with the use of an ERP database, in: The Federated Conference on Computer Science and Information Systems (2013), pp.1285-1290.
5. S.T. Enns: MRP performance effects due to forecast bias and demand uncertainty, European Journal of Operational Research Vol. 138 (2002), pp.87-102.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献