Affiliation:
1. Guangdong Power Grid Corporatiion
Abstract
Abstract: On the condition of protecting the critical load, it is necessary to restore the service of outage area without fault as soon as possible after the occurrence of fault in smart distribution system. A fast service restoration method is proposed for medium-voltage distribution system with distributed generations, which combines intentional islanding of DGs for network reconfiguration. Under the condition of safety limits, the out of service areas are achieved maximization of restoration, making full use of DGs. The whole process of restoration is regarded as a multi-stages decision problem, and divided into four stages. Compared to the existing algorithms, this method can effectively avoid the time-consuming and search results problems, and the simulation results are better. The effectiveness and practicality of the propose approach is demonstrated by simulations on a PG&E 69-nodes system with DGs.
Publisher
Trans Tech Publications, Ltd.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Service Restoration Algorithm of Distribution Power System;2022 IEEE 4th International Conference on Civil Aviation Safety and Information Technology (ICCASIT);2022-10-12