Author:
Ghaffari Jajin Morteza,Esmaeili Niloofar,Hamedi Gholam Hossein
Abstract
Rutting is a common damage of flexible pavements, reducing the service life of asphalt pavement. Due to laboratory limitations, asphalt mixtures are subjected to different curing times (since construction until placement in the test chamber) and thermal equilibrium times (since placement in the test chamber until the beginning of the test) before rutting tests. Neglecting these factors can lead to errors in the laboratory results. Therefore, the present study attempted to investigate the effect of curing times of 1, 2, and 3 days at 25ºC and thermal equilibrium times of 2, 4, and 6 hours on the rutting potential of different hot-mix asphalt (HMA) mixtures. Results of rutting tests showed that the rutting potential of asphalt mixtures decreases by increasing the curing time, while the permanent deformation at the end of loading cycles and rutting potential increase by increasing the thermal equilibrium time. Additionally, the results of statistical analyses revealed that curing time and thermal equilibrium time change the rutting potential of asphalt mixtures.
Publisher
Periodica Polytechnica Budapest University of Technology and Economics
Subject
Geotechnical Engineering and Engineering Geology,Civil and Structural Engineering
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献