Abstract
This article analyzes the main factors that cause local wagons to stay on the rail when it comes to freight wagons, and develops technological processes for the processing of trains on technical stations. A formula for determining the total number of shipments from the station is also proposed. The interrelation of the operations carried out during the interval between train departure stations to the established stations, and the method of finding the overestimated hours during the operation of inter-sectional distance. The authors have developed a formula for determining the total number of operations from train stations to the designated stations, as well as an algorithm for calculating rail carriages from station to station.
Publisher
Blue Eyes Intelligence Engineering and Sciences Engineering and Sciences Publication - BEIESP
Subject
Management of Technology and Innovation,General Engineering
Cited by
10 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献