1. Driscoll J, Hurley S: The application of a generic critical resource scheduler to a manufacturing system, in proceedings Flexible Automation and Information Management, ed., Eyada, OK and Ahmed, MM, CRC Press, USA, 1992, pp. 677-688.
2. Goldratt EM, Fox RE: The Race, North River Press, 1986.
3. Karmarkar US, Kekre S et al: Capacity analysis of a manufacturing cell. J Of Manufacturing Systems, Vol. 6(3): 165-175, 1989.
4. Urnble MM, Srikanth ML: Synchronous Manufacturing, South Western Publishing Co. 1990.
5. Corke DK: A Guide To CAPM, Institute of Production Engineering.