1. Sadovenko, I., & Tymoshchuk, V. I. (2012). Modeling of the mechanism of hydrogeodynamic loading of the main roof of coal seams above the mechanized attachment of the cleaning hole. [Modelyuvannya mehanizmu gidrogeodinamichnogo navantazhennya osnov-noyi pokrivli vugilnih plastiv nad mehanizova-nim kriplennyam ochisnogo viboyu] Collection of Research Papers of the National Mining University, (39), 5–11. http://ir.nmu.org.ua/han dle/123456789/147730?show=full (in Ukrainian)
2. Sdvyzhkova, O., Babets, D., Kravchenko, K., & Smirnov, A. (2015). Rock state assessment at initial stage of longwall mining in terms of poor rocks of Western Donbass. New Developments in Mining Engineering 2015. CRC Press. https://doi.org/10.1201/b19901 .
3. Sdvizhkova, Y., Babets, D., & Smirnov, A. (2014). Support loading of assembly cham-ber in terms of Western Donbas plough long-wall [Analiz zakonomernostej formirovaniya nagruzki na krep pri proektirovanii montazh-nyh kamer strugovyh lav v usloviyah Zapad-nogo Donbassa]. Naukovyi Visnyk Natsional-noho Hirnychoho Universytetu, (5), 26–32. http://www.nvngu.in.ua/index.php/en/-compo nent/jdownloads/finish/49-05/1454-2014-5-sdvi zhkova/0. (In Russian)
4. Medyanik, V., Shevchenko, A., & Pojmanov, S. (2013). Analysis of coal reserves development on seam С5 mine «Samarskaya» PSS «Mine management Ternovskoe» PJSC «DTEK Pavlogradugol» [Analiz vidpracyu-vannya zapasiv vugillya po plastu С5 ShP «Sa-marska» VSP «Shahtoupravlinnya Ternivske» PAT «DTEK Pavlogradvugillya»]. Mining of Mineral Deposits, 7, 171–182. http://dspace. nbuv.gov.ua/handle/123456789/104484. (In Russian)
5. Bondarenko, V. I., Kovalevskaya, I. A., Barabash, M. V., & Chervatyuk, V. G. (2015). Investigation of the loading of the lining of the treatment complex in difficult mining and geological conditions [Issledovanie nagruzhe-niya krepi ochistnogo kompleksa v slozhnyh gorno-geologicheskih usloviyah]. Coal of Ukraine, 6, 31–35. http://nbuv.gov.ua/UJRN/u gukr_2015_6 _7. (In Russian)