1. The current status of ASTRO-H/HXT development facility;Furuzawa,2009
2. On-ground calibration of the Hitomi Hard X-ray Telescopes
3. NuSTAR hard x-ray optics design and performance;Koglin,2009
4. Coatings for the NuSTAR mission;Christensen,2011
5. Brejnholt, N., Christensen, F., Westergaard, N., Hailey, C., Koglin, J., and Craig, W., “Nustar on-ground calibration ii: Effective area,” Proceedings of SPIE, the International Society for Optical Engineering, SPIE - International Society for Optical Engineering (2012). SPIE Astronomical Telescopes + Instrumentation 2012, conference 8443, paper 70.; SPIE Astronomical Telescopes + Instrumentation 2012; Conference date: 01-07-2012 Through 06-07-2012.