1. A. Kreisel et al., “SARAF phase-I proton/deuteron LINAC beam operation status,” WEIOB02, LINAC’14, Geneva, Switzerland, 2014.
2. D. Berkovits et al., “Operational experience and future goals of the SARAF proton/deuteron LINAC,” LINAC2012, Tel Aviv, 2012, pp. 100–104.
3. Design of RF power coupler for superconducting cavities