Author:
Anandh K. S.,Prasanna K.,Priya M. G. Soundarya,Simon S. Manna
Reference19 articles.
1. Just-in-Time application and implementation for building material management
2. Intelligence approach to production planning system for bespoke precast concrete products
3. Wang Z., Hu H., Gong J., “Simulation based multiple disturbances evaluation in the precast supply chain for improved disturbance prevention”, Journal of Cleaner production, 2017.
4. Enhancing the logistics of construction materials through activity‐based simulation approach
5. Clyde Zhengado Li, Xiaoxiao Xu, Geoffrey Qipingshen, Cheng Fan, Xiao Li, Jingke Hong, “A model for simulating risk in prefabrication housing production: a case study of six-day cycle assembly activities in HongKong,” Journal of cleaner production, 2018.
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献