Author:
Gupta Deepak,Sehgal Poojadeep
Reference21 articles.
1. Optimal two- and three-stage production schedules with setup times included
2. Application of the Branch and Bound Technique to Some Flow-Shop Scheduling Problems
3. P. C. Bagga, Sequencing in a rental situation, Journal of Canadian Operation Research Society., 7 (1969) 152–153
4. Special cases of the flow-shop problem
5. P. L. Maggu and G. Dass, Equivalent jobs for job block in job sequencing, Opsearch, 14(4) (1977) 277–281