Abstract
This paper models and solves the scheduling problem of cable manufacturing industries that minimizes the total production cost, including processing, setup, and storing costs. Two hybrid meta-heuristics, which combine simulated annealing and variable neighbourhood search algorithms with tabu search algorithm, are proposed. Applying some case-based theorems and rules, a special initial solution with optimal setup cost is obtained for the algorithms. The computational experiments, including parameter tuning and final experiments over the benchmarks obtained from a real cable manufacturing factory, show superiority of the combination of tabu search and simulated annealing comparing to the other proposed hybrid and classical meta-heuristics.
Subject
Applied Mathematics,Information Systems,General Medicine
Reference75 articles.
1. A multi objective optimization approach for flexible job shop scheduling problem under random machine breakdown by evolutionary algorithms;Computers & Operations Research,2016
2. A multi-objectives scheduling algorithm based on cuckoo optimization for task allocation problem at compile time in heterogeneous systems;Expert Systems with Applications,2016
3. Geometric operators based on linguistic interval-valued intuitionistic neutrosophic fuzzy number and their application in decision making;Ann Optim Theory Practices,2020
4. A survey of scheduling problems with setup times or costs;European Journal of Operational Research,2008
5. Scheduling an unbounded batching machine with job processing time compatibilities;Discrete Applied Mathematics,2012
Cited by
19 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献